We are currently preparing a large salvage operation of office partition walls that have become redundant in an administrative building. In total more than 2200 running meter of fireproof (RF30) partitions, more than 400 doors and 300 glazed elements will be offered for purchase. Dismantling will take place between May and October 2017. To keep costs at a minimum, we aim to find new destinations for these elements straight from the deconstruction site. A sample of the different components is on display in our showroom.
In collaboration with Louis De Waele, the ONSS (Office Nationale Sécurité Social) and CSTC (Centre Scientifique et Technique de la Construction).






Large salvage operation of fireproof office partitions with Louis De Waele, Bruxelles
Published on 15/05/2015